| 
 | 
	PISTON
Removal, page 7-13 Measurement, page 7-16PISTON RINGS
Replacement, page 7-22PISTON PIN
Removal, page 7-19 Inspection, page 7-20 Installation, page 7-21ENGINE BLOCK
Cylinder bore inspection, page 7-16 Warpage inspection, page 7-16 Cylinder bore honing, page 7-18 Ridge removal, step 13 on page 7-14CONNECTING ROD BEARING CAPCONNECTING ROD BOLT
Inspection, page 7-25CONNECTING ROD BEARINGS
Oil clearance, page 7-9 Selection, page 7-10CONNECTING ROD
End play, page 7-6 Small end measurement, page 7-20 |