| Turn the ignition switch OFF.
 Inspect the No. 6 ECU (ECM) (15A) fuse in the under-hood fuse/relay box.
Is the fuse OK?
 YES - Go to step 29. NO - Go to step 23. Remove the blown No. 6 ECU (ECM) (15A) fuse in the under-hood fuse/relay box.
 Remove the PGM-FI main relay 1 (A).
 LHD model: 
 RHD model: 
 | 
 | Check for continuity between body ground and the PGM-FI main relay 14P connector terminals No. 2 and No. 4 individually.
 
 Is there continuity? YES - Repair short in the wire between the No. 6 ECU (ECM) (15A) fuse and the PGM-FI main relay 1. Also replace the No. 6 ECU (ECM) (15A) fuse.   NO - Go to step 26. Disconnect each of the components or the connectors below, one at a time, and check for continuity between the PGM-FI main relay 1 4P connector terminal No. 1 and body ground.
 
PGM-FI main relay 2
	ECM connector A (31P)Each injector 2P connectorIdle air control (IAC) valve 3P connectorTop dead centre (TDC) sensor 3P connectorCrankshaft position (CKP) sensor 3P connector
 
 |